Developed Safe-Secure Facilities Action Plan that takes steps to reinforce and refine our safety processes and protocols.
West High School Boiler Replacement with a reduction in energy costs of approximately $8,000.
West High School Locker Replacement for those in poor condition and in some cases, unusable.
|
|
|
|
|
|
| |
| |
| July 2011 |
 |
|
 |
|
|
Sealcoated blacktop at Fearn Elementary School, Herget and Jewel Middle Schools and Transportation Center
Added additional intercom speakers at West High School so that all areas both inside and outside the school can receive emergency information
Installed emergency-exit sidewalks at West High School
Repaired south side of the West High School stadium
Repaired leaking windows at Greenman
Added accessible washrooms at the West High School auditorium and stadium as well as the boys' and girls' locker rooms at Washington Middle School
Constructed accessible ramp at Freeman Elementary School |
|
|
|
|
|
| |
| |
| May 2011 |
 |
|
 |
|
|
| Begin construction of all-weather surface at West High School stadium, funded by community donations, to provide a quality educational space for physical education classes, band and athletics and to increase the ability for the field to be used by the community. |
|
|
|
|
|
| |
| |
| August 2010 |
 |
|
 |
|
|
Completed building accessibility study with Dr. Steve Nourse and then completed some of the recommendations that do not incur significant costs
Implemented new bus safety steps, including student ID tags used by Kindergarten through 2nd grade students to help insure students are placed on the correct bus, additional phone lines and office help in transportation to improve communication with parents during the first week of school
Continue implementation of eSchool, our new student information system
Meet with each school principal and representatives from law enforcement and fire protection to review the school’s crisis plans and to identify areas needing improvement |
|
|
|
|
|
| |
| |
| June 2010 |
 |
|
 |
|
|
Replaced roof on West Aurora High School D Wing
Replaced brick and took action to correct water and expansion problems at Jewel Middle School
Re-aligned and upgraded servers at West High School and the administration building
Improved parent pickup and drop off and resulting traffic issues at Smith, Hall, Nicholson and Jefferson. |
|
|
|
|
|
| |
| |
| October 2009 |
 |
|
 |
|
|
Waterproof exterior wall in Lincoln basement
Update fire alarm system in West High stadium
Install additional security cameras inside and outside at West High
Complete fire department inspections in all buildings and responded to items that needed repair |
|
|
|
|
|
| |
| |
| August 2009 |
 |
|
 |
|
|
| Reduce bus emission pollution with installation of new filters |
|
|
|
|
|
| |
| |
| April 2009 |
 |
|
 |
|
|
| Install keyless access system for west door at Jefferson |
|
|
|
|
|
| |
| |
| March 2009 |
 |
|
 |
|
|
Install improved fire door exit hardware on interior doors at Smith
Replace emergency gas shut-offs in science rooms at Jefferson |
|
|
|
|
|
 |
| |
| December 2008 |
 |
|
 |
|
|
Upgrade computer servers and routers
Install emergency shut-off valves for kilns at Freeman, Goodwin, Hill and Schneider |
|
|
|
|
|
 |
| |
| September 2008 |
 |
|
 |
|
|
Complete parking lot light improvements at West High
Review school crisis plans with police and fire departments
Complete fire department inspections of school facilities
Complete fiber installation |
|
|
|
|
|
| |
| |
| July 2008 |
 |
|
 |
|
|
Complete interior/exterior painting at Goodwin
Receive 14 new school buses as part of an ongoing refresh cycle to replace aging vehicles
Complete seal coating refresh cycle
Complete below basement drainage system at Freeman |
|
|
|
|
|
 |
| |
| Summer 2008 |
 |
|
 |
|
|
Demolish two houses on Randall
Remove asbestos in several locations
Partial replacement of failed roof at Lincoln
|
|
|
|
|
|
 |
| |
| May 2008 |
 |
|
 |
|
|
Approve pavement work At Schneider Elementary School
Approve renovations of restrooms at West High
Approve purchase of a new chair lift for West High
Approve gym curtain for the red field house at West High
Approve resurfacing of the West High tennis court
Approve modular classrooms for Jefferson Middle School
Approve purchase of four 71-passenger school buses
Schools receive Thunderbolt lightning detectors |
|
|
|
|
|
| |
| |
| February 2008 |
 |
|
 |
|
|
Approve Greenman security system
Install emergency, district-wide radio system
Install Transportation area security system |
|
|
|
|
|
 |
| |
| Decemeber 2007 |
 |
|
 |
|
|
Approve bid for 50 digital video recording systems for school buses
Approve purchase of two 14-passenger activity buses and ten 71-passenger buses
|
|
|
|
|
|
 |
| |
| October 2007 |
 |
|
 |
|
|
| Authorize installation of West High security cameras and electronic locking system |
|
|
|
|
|
| |
| |
| August 2007 |
 |
|
 |
|
|
Approve contract for West High hot water tank replacement
Principals and administrators receive FEMA training in the National Incident Command System
Begin West High painting refresh cycle |
|
|
|
|
|
| |
| |
| June 2007 |
 |
|
 |
|
|
| Approve asbestos abatement for Freeman, Hall, Nicholson and West High |
|
|
|
|
|
| |
| |
| May 2007 |
 |
|
 |
|
|
Begin West High gym floor replacement
Discussion begins on the ADA Accessibility Audit |
|
|
|
|
|
| |
| |
| October 2006 |
 |
|
 |
|
|
| Receive $250,000 school safety grant to provide training, classroom emergency go kits, and a district wide emergency radio system |
|
|
|
|
|