Vision 129: Safe, Secure School Buildings


 
August 2012



  • Washroom Accessibility Renovations at Jefferson, Washington & West High locker rooms as well as the main gym and stadium at West High.

  • District Wide Lighting Upgrades to remove and replace lighting fixtures with energy efficient fixtures in areas not previously upgraded. This is phase II of this project.

  • Smith Elementary School HVAC Upgrade which are estimated to save $40,300 annually on energy and maintenance. This will also provide the ability to offer summer programs there.
  •  
    June 2011


  • Replaced roof at Hill
    Elementary School

  • Completed installation of electronic access control at all elementary schools

  • Repaved the road and bus loading area at Hope Wall and widened sidewalks to provide a safer loading area for students in wheelchairs. The entire project is being funded by a federal special education grant.
  •  
    March 2011


  • Received a $200,000 energy efficiency lighting grant to replace fixtures that will save the school district $100,000 annually in energy costs

  • Improved monitoring devices and procedures for access to schools
  •  
    February 2011


  • Installed electronic access control at all four middle schools
  •  
    November 2010


  • Completed Health Life Safety inspections by the Kane County Regional Offi ce of Education of all schools and facilities
  •  
     
     
    July 2010


  • Reduced costs of supplies through bidding and careful monitoring of ordering by custodians
  •  
     
     
     
     
    November 2009


  • Install exterior security cameras at Hall
  • September 2009


  • Replace West High ball field lights
  • June - July 2009


  • Repair water-damaged wall at Hall

  • Abate asbestos in Washington classrooms and library

  • Abate asbestos in West High classrooms and music rooms

  • Install door at West High in compliance with Americans with Disabilities Act

  • Re-key one section of interior doors at West High (first part of a three-year project)

  • Add fire lanes in front of elementary buildings
  • October 2008


  • Complete Regional Office of Education inspections of school facilities


  • Approve leak repair and excavation work at Hill Elementary


  • Improve drainage issues at Goodwin, Hall and McCleery
  •  
    August 2008


  • Complete renovation of eight West High restrooms


  • Install new chair lift at West High


  • Install automated entry door at Herget Middle School


  • Complete resurfacing of Schneider playground and front walk

  • Complete interior/exterior painting at Schneider


  • Complete tennis court resurfacing at West High

  • Complete new canopy over gas pumps at Transportation Center


  • Complete modular classroom installation at Jefferson Middle School


  • Complete asbestos abatement and new floor finishes at Freeman, Hall, Smith, Washington and West High


  • Replace roof over Lincoln Elementary School administration area


  • Replace gym curtain dividers in red field house at West High


  • Complete interior painting at West High


  • Install handicap ramps in east parking lot at West High

  • Hold line on maintenance and refresh projects
  •  
    April 2008
     

    Approve administration office security system
     
    March 2008
     

  • Receive the first of 10 new school buses with 14 additional buses to arrive this summer

  • Install video surveillance equipment in school buses

  • Approve Freeman ventilation and drainage bids

  • Community group helps develop Greenman security
  •  
    January 2008
     

  • Install West High security system

  • Purchase lightning detectors for use on playgrounds, sporting events and field trips

  • Approve bid for Freeman mold abatement

  • Approve AT&T as the district fiber network provider
  • November 2007
     

    Approve contract for West High hot water tank replacement
    September 2007
     

  • Community volunteers fund, build Hope Wall track, garden, playscape

  • Install portable classrooms at four overcrowded schools -- Fearn, McCleery, Hill and Nicholson

  • Make repairs to Freeman, Hall, Nicholson and Smith
  • July 2007
     

  • Begin seal coating refresh cycle for parking lots

  • Replace outdated intercom system at Schneider

  • Approve asbestos abatement bids at Smith Elementary School

  • Approve bids for ceiling restoration at Nicholson Elementary School
  •  
    April 2007
     

    Referendum passes. Voters approve new operating rate
     
     

    September 2012


  • Developed Safe-Secure Facilities Action Plan that takes steps to reinforce and refine our safety processes and protocols.
  • West High School Boiler Replacement with a reduction in energy costs of approximately $8,000.
  • West High School Locker Replacement for those in poor condition and in some cases, unusable.
  •  
     
    July 2011

  • Sealcoated blacktop at Fearn Elementary School, Herget and Jewel Middle Schools and Transportation Center

  • Added additional intercom speakers at West High School so that all areas both inside and outside the school can receive emergency information

  • Installed emergency-exit sidewalks at West High School

  • Repaired south side of the West High School stadium

  • Repaired leaking windows at Greenman

  • Added accessible washrooms at the West High School auditorium and stadium as well as the boys' and girls' locker rooms at Washington Middle School

  • Constructed accessible ramp at Freeman Elementary School
  •  
     
    May 2011

  • Begin construction of all-weather surface at West High School stadium, funded by community donations, to provide a quality educational space for physical education classes, band and athletics and to increase the ability for the field to be used by the community.
  •  
     
    August 2010

  • Completed building accessibility study with Dr. Steve Nourse and then completed some of the recommendations that do not incur significant costs

  • Implemented new bus safety steps, including student ID tags used by Kindergarten through 2nd grade students to help insure students are placed on the correct bus, additional phone lines and office help in transportation to improve communication with parents during the first week of school

  • Continue implementation of eSchool, our new student information system

  • Meet with each school principal and representatives from law enforcement and fire protection to review the school’s crisis plans and to identify areas needing improvement
  •  
     
    June 2010

  • Replaced roof on West Aurora High School D Wing

  • Replaced brick and took action to correct water and expansion problems at Jewel Middle School

  • Re-aligned and upgraded servers at West High School and the administration building

  •  Improved parent pickup and drop off and resulting traffic issues at Smith, Hall, Nicholson and Jefferson.
  •  
     
    October 2009

  • Waterproof exterior wall in Lincoln basement

  • Update fire alarm system in West High stadium

  • Install additional security cameras inside and outside at West High

  • Complete fire department inspections in all buildings and responded to items that needed repair
  •  
     
    August 2009

  • Reduce bus emission pollution with installation of new filters
  •  
     
    April 2009

  • Install keyless access system for west door at Jefferson
  •  
     
    March 2009

  • Install improved fire door exit hardware on interior doors at Smith

  • Replace emergency gas shut-offs in science rooms at Jefferson
  •  
    December 2008

  • Upgrade computer servers and routers

  • Install emergency shut-off valves for kilns at Freeman, Goodwin, Hill and Schneider
  •  
    September 2008

  • Complete parking lot light improvements at West High


  • Review school crisis plans with police and fire departments


  • Complete fire department inspections of school facilities

  • Complete fiber installation
  •  
     
    July 2008

  • Complete interior/exterior painting at Goodwin


  • Receive 14 new school buses as part of an ongoing refresh cycle to replace aging vehicles


  • Complete seal coating refresh cycle


  • Complete below basement drainage system at Freeman
  •  
    Summer 2008

  • Demolish two houses on Randall

  • Remove asbestos in several locations

  • Partial replacement of failed roof at Lincoln
  •  
    May 2008

  • Approve pavement work At Schneider Elementary School

  • Approve renovations of restrooms at West High

  • Approve purchase of a new chair lift for West High

  • Approve gym curtain for the red field house at West High

  • Approve resurfacing of the West High tennis court

  • Approve modular classrooms for Jefferson Middle School

  • Approve purchase of four 71-passenger school buses

  • Schools receive Thunderbolt lightning detectors
  •  
     
    February 2008

  • Approve Greenman security system

  • Install emergency, district-wide radio system

  • Install Transportation area security system 
  •  
    Decemeber 2007

  • Approve bid for 50 digital video recording systems for school buses

  • Approve purchase of two 14-passenger activity buses and ten 71-passenger buses
  •  
    October 2007

    Authorize installation of West High security cameras and electronic locking system
     
     
    August 2007

  • Approve contract for West High hot water tank replacement

  • Principals and administrators receive FEMA training in the National Incident Command System 

  • Begin West High painting refresh cycle
  •  
     
    June 2007

    Approve asbestos abatement for Freeman, Hall, Nicholson and West High
     
     
    May 2007

  • Begin West High gym floor replacement

  • Discussion begins on the ADA Accessibility Audit
  •  
     
    October 2006

    Receive $250,000 school safety grant to provide training, classroom emergency go kits, and a district wide emergency radio system 
    Safe & Secure
    School Buildings
    Vision 129 Main Menu
    Safe / Secure Main Menu
    Facilities Plan of Work
    Operating Department
    Safety Action Plan